Raditya Putra
Electronic - Institute Technology National Malang
Education
University: Institute Technology National Malang
Training
Offshore Technology Institute
RCMS UI
Work Experience
QA/QC Piping Coordinator
PT. Indo Teknik Industri - ConstructionResponsibilities:
1. Prepare pre-liminary test packages for piping testing ( P&ID marking, iso preparation ).
2. Internal Walkdown Test Packages for punchlist construction.
3. Closing and clearing punchlist test packages
4. Completing all document for test ( NDE, Welding Summary Sheet, PID Marking)
5. Perform Hydrotest for completed package
QA/QC Piping
PT. Indo Teknik Industri - ConstructionResponsibilities:
1. Prepare pre-liminary test packages for piping testing ( P&ID marking, iso preparation ).
2. Internal Walkdown Test Packages for punchlist construction.
3. Closing and clearing punchlist test packages
4. Completing all document for test ( NDE, Welding Summary Sheet, PID Marking)
5. Perform Hydrotest for completed package
QA/QC Piping
PT. Indo Teknik Industri - ConstructionResponsibilities:
1. Prepare pre-liminary test packages for piping testing ( P&ID marking, iso preparation ).
2. Internal Walkdown Test Packages for punchlist construction.
3. Closing and clearing punchlist test packages
4. Completing all document for test ( NDE, Welding Summary Sheet, PID Marking)
5. Perform Hydrotest for completed package
QA/QC ENGINEER
Samsung C&T - ConstructionResponsibilities:
1. Prepare pre-liminary test packages for piping testing ( P&ID marking, iso preparation ).
2. Prepare & check material (pipe, fitting) requirement before site erection and installation.
3. Re-routing clashing pipe and make asbuilt isometrict as per site condition
4. Prepare requirement document before testing.
5. Coordination with site supervisor for punch clearing
PIPING ENGINEER
PT. INDO TEKNIK INDUSTRI - ConstructionResponsibilities:
1. Prepare pre-liminary test packages for piping testing ( P&ID marking, iso preparation ).
2. Prepare & check material (pipe, fitting) requirement before site erection and installation.
3. Re-routing clashing pipe and make asbuilt isometrict as per site condition
4. Prepare requirement document before testing.
5. Coordination with site supervisor for punch clearing